The correct way of foundation construction platform fixed lift, Jinan MORN Machinery Co., Ltd. is a professional manufacturer of lifting platform, providing customers with a full range of products and services. Prior to the arrival of equipment, how to build the foundation to become an important factor in whether the normal use of fixed lifting platform, the following drawings show a steady foundation lifting platform in detail to tell you about the foundation construction should pay attention to what. In the illustrated example, which is a fixed lifting platform, elevated 2200mm, load 2000kg, table size 2000 * 1800mm
2. C20 concrete foundation by pouring the foundation at the bottom of the thickness of 300mm, each carrying capacity of more than five tons foundation
3. Foundation four weeks embedded protection angle 60 * 60 * 5mm
Embedded conduit between the power supply and ground base 4.
5. To shape Foundation Founder, diagonal error control in less than 10mm.
6. foundation diameter size of 2150 * 1860 * 520mm